Changing the face of Charleston:
Building of the Arthur Ravenel Jr. Bridge
Frank's Home Page
Karpeles Museum display's my story of Building the Ravenel Bridge:
Oct 17, 2007 - ? (Permanent Exhibit)
Archive of building stories
Exploring digital sketches
Unbuilding the Grace and Pearman Bridges
Visit our Photo Essays
Click for all web page building segments
I enjoy hearing from you. If you have comments and suggestions, write me.

Highlights
As seen from the Aquarium
East Bay on ramp
The Last Shark Fin
Closing the main span gap
Paving the bridge
The last stay cable
Opening Events
Engineering Challenges
Stories of Bridge Folks
Erecting Steel
Building Bridge Blog

May 25, 2005
Paving is finished - and what a sunset!

I spent the day at the Savannah River Research Center and did not get back to Charleston until about 6pm. I got to the bridge about 8pm thinking I'll look and surely they will not start paving before 10pm. I got there and guess what? - they had not only started they have almost finished. So here is the end of the paving story.

First - your typical Charleston sunset - simply fantastic

And the 50 foot (more or less) last segment - looking east

The last segment looking west

The tired Bidwell paving machine

Remaining was a src="https://s3.amazonaws.com/s3.ravenelbridge.net/small gutter to be paved

Here is the entire team waiting for everything to be in their respective launching positions. The man on the left is operating the mixing machine while the guys on the right are waiting for the mixed concrete to slide down the delivery trough.

Doing the finish work and the sunset.

As the mixing truck drives into the sunset, here is a final view of the entire paving ensemble - a mixer, the team and the sunset.

Creative Commons License
This work is licensed under a Creative Commons License.

Attribution: C. Frank Starmer from http://ravenelbridge.net

_